Project Status: Completed 2021
The purpose of the Lower Walsh Field Improvement Project was to renovate the current track and field at the Walsh Middle School Lower Athletic Complex, located at 301 Brook Street, Framingham, Ma 01701. This project included removal of the current track, replacing it with a smaller walking pathway; removal and capping of current drainage structures within the center playing field below grade; installation of a new natural turf field within the center area of the track; installation of irrigation system to all areas shown in site plans; and overall stormwater drainage improvements.
Bograd Field Dedication

Lower Walsh Track and Field Renovation Progress

  1. 1 Lower Walsh Facility Condition as of 5-25-2018
  2. 2 Lower Walsh start of construction April 2020
  3. 3 Lower Walsh construction April 2020
  4. 4 Lower Walsh progress early May 2020
  5. 5 Lower Walsh progress
  6. 6 Lower Walsh progress2 early May 2020
  7. 7 Lower Walsh progress3 early May 2020
  8. 8 Lower Walsh progress4 early May 2020
  9. 9 Mid May 2020 w/DPW
  10. 10 Walsh Renovation DPW
  11. 11 Walsh Reno DPW
  12. 12 Lower Walsh Progress5 May.28.2020
  13. 13 Lower Walsh Progress May.28.2020
  14. 14 Lower Walsh Progress2 May.28.2020
  15. 15 Lower Walsh Progress3 May.28.2020
  16. 16 Lower Walsh Progress6 May.28.2020
  17. 17 Walsh Renovation grading 7.24.2020