Potter Road Bridge

Project overview

This project will repair the Potter Road Bridge located over the Sudbury River. The bridge is situated in between the City of Framingham on Potter Road and the Town of Wayland on Stonebridge Road. This two-span, concrete bridge was originally constructed in 1957. The proposed structural repair work will extend the existing bridge life. Taking these repair initiatives now will avoid major or total reconstruction in the future. Bridge design and repair costs will be shared between the City of Framingham and the Town of Wayland.

Project update - Winter 2021/2022

Design work is complete. The project will be advertised for a bid during this winter, with construction expected to start in 2022. 

Photos of Current Conditions