project overview
The project scope focuses on improvements to the Fountain Street corridor. Intersection improvements include pedestrian and traffic safety, replacement of the existing temporary traffic signal, and drainage improvements that will benefit the water quality of Farm Pond. The proposed intersection geometry will add a right turn lane, increase lengths of existing turning lanes, and provide accessible pedestrian crossings.
Project update - Spring 2022
Easement acquisitions will take place this spring, along with utility pole installation and overhead wire transfers. Funding for the final design and construction has been requested through the FY2023 Capital Budget.
QUESTIONS
Please contact DPWGeneral@framinghamma.gov or call 508-532-6040.